* Semaine 26/30 Octobre:
|
||||
- Lundi:
|
||||
- poser isolation plafond droit
|
||||
- poser plaquo plafond droit
|
||||
- ~~poser isolation plafond droit~~
|
||||
- ~~poser plaquo plafond droit~~
|
||||
|
||||
- Apres lundi:
|
||||
- coffrage plaquo pour les encadrements des fenetres
|
||||
- ~~coffrage plaquo pour les encadrements des fenetres~~
|
||||
- decrocher le cable fibre et le ramener vers le DD2 (a faire pour le lundi au plus tard)
|
||||
- poser structure autour du bloc reseau
|
||||
- aggrandir le trou acces cable elec exterieure
|
||||
- ~~poser structure autour du bloc reseau~~
|
||||
- ~~recuperer un switch~~ (solargate dispo au container)
|
||||
- raccorder fibre optique au DD2 avec Obinou (a confirmer)
|
||||
- raccorder electricite exterieure au container
|
||||
@ -107,3 +106,25 @@
|
||||
- poser radiateur
|
||||
|
||||
|
||||
* avant mercredi 11 nov:
|
||||
- finir enduit plaquo
|
||||
- finir peindre mur et plafond
|
||||
- peindre sol
|
||||
- finir boitier reseau muraux rj45
|
||||
- decouper morceau plaquo de la taille du dessus du tableau elec (la peindre)
|
||||
- tirer fibre optique
|
||||
- recuperer etagere 19 pouces (envoyer mail)
|
||||
|
||||
|
||||
* Mercredi 11 novembre:
|
||||
- poaser les 3 radiateurs(th)
|
||||
- finir baie reseau
|
||||
- finir bloc issue secours
|
||||
- acheter disjoncteur 2A gewiss
|
||||
- tirer cable 5g6 jusqu au tableau exterieur
|
||||
- raccorder si cable tire
|
||||
- poser plaquo au dessu du tableau
|
||||
- poser vmc
|
||||
=> demenagement
|
||||
|
||||
|
BIN
img/20151027_182612.jpg
Normal file
BIN
img/20151027_182612.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 54 KiB |
BIN
img/20151027_182632.jpg
Normal file
BIN
img/20151027_182632.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 47 KiB |
BIN
img/20151027_182642.jpg
Normal file
BIN
img/20151027_182642.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 57 KiB |
BIN
img/20151027_182649.jpg
Normal file
BIN
img/20151027_182649.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 46 KiB |
BIN
img/20151027_182658.jpg
Normal file
BIN
img/20151027_182658.jpg
Normal file
Binary file not shown.
After Width: | Height: | Size: 52 KiB |
@ -133,6 +133,38 @@
|
||||
| | |
|
||||
|
||||
|
||||
| Travaux 27/10/2015 | |
|
||||
|---|---|
|
||||
| | |
|
||||
| | |
|
||||
| | |
|
||||
|
||||
|
||||
| Travaux 28/10/2015 | |
|
||||
|---|---|
|
||||
|
||||
|
||||
| Travaux 01/11/2015 | |
|
||||
|---|---|
|
||||
`
|
||||
|
||||
| Travaux 03/11/2015 | |
|
||||
|---|---|
|
||||
|
||||
|
||||
| Travaux 04/11/2015 | |
|
||||
|---|---|
|
||||
|
||||
|
||||
| Travaux 05/11/2015 | |
|
||||
|---|---|
|
||||
|
||||
|
||||
| Travaux 07/11/2015 | |
|
||||
|---|---|
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
|
||||
|
Loading…
Reference in New Issue
Block a user